Pierre C Belarge
Senior Member
- Location
- Westchester County, New York
If we have a situation where there are multiple occupancies in one building with a service supplying the building having one main service disconnect. The occupancies are then supplied with feeders, each having an EGC installed to the occupancy. The building is built in such a way, that each occupancy has it's own metallic water supply and meter, the metallic water pipe does not go through the building, but is supplied to each occupancy from the outside city supply via an underground installation.
Can I use 250.104(A)(2) for my installation? Do we need the plumber to install a nonmetallic isolation section to these units?
Can I use 250.104(A)(2) for my installation? Do we need the plumber to install a nonmetallic isolation section to these units?