Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
I took a NECA MLU course and they said that sometime a labor unit will be reduced for pipe if there are multiple parallel sets. Why is this? Because of the setup time, they are located right next to each other? I think also because a MLU includes material handling time and these would be brought to the location together. Thanks.