A/A Fuel GTX
Senior Member
- Location
- WI & AZ
- Occupation
- Electrician
Can two sets of service entrance conductors from the load side of a two position meter socket be installed in the same conduit as long as derating is observed? Then, can one set of the service entrance conductors pass through one panel and terminate in an adjacent panel?