We have 4 service equipment panels in one building supplied from transformers located in 2 separate outside buildings. The structural building has a ground grid.Is it OK to connect each service equip panel to the ground grid and bond with the grounded neutral and equipment ground in each case.I guess we should maintain segregation such that feeders and branch circuits from one service equip panel are grounded only in that panel and there is no intermixing