It is accpetable to run Two or more Services in a single conduit "after" the Utility Meter? General configuration - PG&E to provide 200A / 1 Ph to a Bussed Gutter, from here, into Meter Bank. Meter Bank to Disconnectes to Transfomers, Xfmer out to Fused Disconnects, Fused Disconnects into common Gutter, Gutter to single 2" Conduit. Conduit to Junction box (1500' away) Seperate Services at Junction Box (Each circuit clearly identified on both ends as Seperate service). Conduit to house 6 conductors - Phase A & B and Ground for Circuit (Service 1) and same for Service 2.