hottoground
Member
Ive just started at this new job and doin a rough in with a simple 350 amp single phase 120/240 v service my boss says "my bonding jumper needs to be bugged outside to the GEC " . i said ive never done that before . ive always gone from the terminal bar of 200 a to 150a its says accesible right . i would think that would be a better gf return path. just what to here what others think