This will be my first mobile home service that I have installed. It will be a 200A overhead service. I plan on running 4- wire 4/0 AL from the Panel on the pole in pvc conduit attatched to the underside of the trailer up into the trailers panel. Does the trailers panel need bonded or just the panel/Disco on the pole? Any help or advice would be much appreciated. Thanks