JimmysLimeade
EE Student & PV Design
- Location
- Utah
- Occupation
- PV Design
Hey guys, I have a building department rejecting some plans because of this:
The service disconnects for the PV system (60A/40A) to rate for thew prevailing condition (service rate) 230.70(C). Please reach out to Building department or have your electrical engineer provide a response letter
We are using planning on using the Eaton DG222NGB disconnect, which is a super common ACD. I cant find any documentation from Eaton that says their ACD is service rated, and I dont know what to do about it.
The service disconnects for the PV system (60A/40A) to rate for thew prevailing condition (service rate) 230.70(C). Please reach out to Building department or have your electrical engineer provide a response letter
We are using planning on using the Eaton DG222NGB disconnect, which is a super common ACD. I cant find any documentation from Eaton that says their ACD is service rated, and I dont know what to do about it.