240.87(C): Performance Testing
The arc energy reduction protection system shall be performance tested by primary current injection testing or another approved method when first installed on site. This testing shall be conducted by a qualified person(s) in accordance with the manufacturer’s instructions.
My question is: What are these approved methods that can be utilized when means of primary current injection testing are not available?
The arc energy reduction protection system shall be performance tested by primary current injection testing or another approved method when first installed on site. This testing shall be conducted by a qualified person(s) in accordance with the manufacturer’s instructions.
My question is: What are these approved methods that can be utilized when means of primary current injection testing are not available?