Contractor pulled a #2AWG, 3C with ground Teck90 cable (direct burial) from the main building to a 120/208 4Wire distribution panel. They should have pulled a 4C with a ground.
It so happens that there is a spare PVC conduit that was also installed in the same trench. Can I use this PVC conduit to run the Neutral conductor to the distribution panel??
If so, am I in violation of NEC 300.20?
It so happens that there is a spare PVC conduit that was also installed in the same trench. Can I use this PVC conduit to run the Neutral conductor to the distribution panel??