wgmacfarlane
New member
Why does the NEC article 310.60(c)(2)(b) say where the burial depths are deeper than shown in a specific underground ampacity table or figure, an ampacity derating of 6% per ft increase in depth for all values of rho shall be "permitted".
Should it not say required?
The consequenses are a reduction of cable life.
Should it not say required?
The consequenses are a reduction of cable life.