An AHJ referenced 445.19, simply indicating the installation complied.
I've read 445.19 and checked the 2008 analysis of code changes...it's not even mentioned.
I do not understand the need for this paragraph being added to the Code.
The two permitted methods for supplying multiple loads from a generator would seem to cover it all.
Any body know the reasoning behind adding this paragraph to the code?