Small paint storage building without paint booth,
paint spray may exist as the equipment operate.
2x4 LED highbay light fixtures are pedant mounted at 32' AFF,
will the lights need to be class 1, division 1 listed lights to use?
Or can the lights belong a separate zone as they are mounted so high
and be exempted? Same questions for panel, xfmr and disconnect installed
in this building need to be class 1, division 1 listed products in order to use? Thank you.
paint spray may exist as the equipment operate.
2x4 LED highbay light fixtures are pedant mounted at 32' AFF,
will the lights need to be class 1, division 1 listed lights to use?
Or can the lights belong a separate zone as they are mounted so high
and be exempted? Same questions for panel, xfmr and disconnect installed
in this building need to be class 1, division 1 listed products in order to use? Thank you.