I was failed on a job and would like to clarify that i am correct or learn where i am incorrect: From a 125 amp service on a residence a main power feeder is ran from service disconnect (overcurrent) to Power System Controller. The new solar and battery backup are connected inside the PSC. From the PSC the main power feeder is ran to the distribution panel which has a buss rated at 125 amp. The inspector says i need to have a buss rated at 125% of the of the solar source circuit plus the 125 amp of the panel overcurrent. At 120% that would require a 150 amp buss. But from what i read of 705.13 the PCS (it is an Enphase controller) restricts the the amps to the feeder and buss rating. His code reference is 705.12(B)(3)(2) which makes no sense to me as the panel is fed with a single feeder-no other source as the solar source circuits land in the system controller.