guggemos
Member
- Location
- Richmond, California
Art. 344.26 allows up to the equivalent of four quarter bends between pull points. My rule of thumb (good design practice) has always been to limit that number of bends to three for ease of installation (wire pulling). I am being asked by a reviewer to maximize the amount of bends per code regardless of industry design practice. I'd like some feedback from others who've actually been involved in this scenario. Thanks.
Al Guggemos
Al Guggemos