I'm working on some building design.

I see pretty often with old builds is the use of a fused switchboard to feed 3 panels and a chiller.

I debating on whether to use a main breaker or replace with a similar switchboard.

Is there anything code wise that requires
the use of a fused switchboard over a main breaker?
 