I'm installing a subpanel in a shed. Is it code compliant to attach neutral(#6 thhn stranded) and egc(#8 thhn) feeders from main panel at location where branch circuits attach. Thinking I would get a better connection as opposed to top lugs. This will be in a ge powermark gold 125amp load center.