hardworkingstiff
Senior Member
- Location
- Wilmington, NC
Page 679 of the 2005 NEC handbook, Exhibit 501.8 shows a "seal at the boundary" on the bottom right hand side of the exhibit.
Am I interpreting 501.15(A)(4) correctly by saying that particular sealoff is not required if this is piped like the picture?
Am I interpreting 501.15(A)(4) correctly by saying that particular sealoff is not required if this is piped like the picture?