Hello All,
I've seen many topics with FMC/greenfield, but I just want someone to answer this question since I do not have a 2005 NEC book:
Is there a maximum length greenfield can be run for a fixture whip/tail? Is there a section in the NEC where it specifically states that greenfield cannot be longer than 6' or is that 6' rule just for whips?
I'm assuming that the 6' 'rule' is used only for fixture whips and FMC is used for another purpose over 6' that grounding connectors come into play.
Not sure but would like some insight.
Thanks!
I've seen many topics with FMC/greenfield, but I just want someone to answer this question since I do not have a 2005 NEC book:
Is there a maximum length greenfield can be run for a fixture whip/tail? Is there a section in the NEC where it specifically states that greenfield cannot be longer than 6' or is that 6' rule just for whips?
I'm assuming that the 6' 'rule' is used only for fixture whips and FMC is used for another purpose over 6' that grounding connectors come into play.
Not sure but would like some insight.
Thanks!