Is anyone familiar with the JEAC (Japan Electric Assoc. Code) and how it may or may not relate to the NEC.
I was under the impression that the NEC had pretty much been accepted as an international standard.
We have multiple workstation in a room, (raised floor, not a plenum) and want junction boxes ( with 3 or 4 branch circuits) placed under the floor at strategic locations and use liquid tight to connect the floor boxes for power.
This is to minimize the clutter under the floor.
The Japanese contractor is saying he must used Galvanized conduit for this wiring.
Any replies are appreciated
Ron M
I was under the impression that the NEC had pretty much been accepted as an international standard.
We have multiple workstation in a room, (raised floor, not a plenum) and want junction boxes ( with 3 or 4 branch circuits) placed under the floor at strategic locations and use liquid tight to connect the floor boxes for power.
This is to minimize the clutter under the floor.
The Japanese contractor is saying he must used Galvanized conduit for this wiring.
Any replies are appreciated