I was at a industrial plant today that has been idol for twenty-five years for as in operation,has been used as storage and minor equiptment. It has 480v 3-phase wey service with transformers 480 y to 208 y for 120 and 208 loads,here is my question at the main pnl has A B C and N into main bkr pnl which is ok,there is another pnl conected next to this pnl that is a main lug only with (six bkrs only) and they are fed with A B C service conductors with no N conductor,would the 6 handle rule apply here without a main? they feed motor loads only.BTW these pnl's are about 30 feet inside the buildingThere are another set of A B C service conductors going to a 400 amp fused disconect then to the cap bank for power factor corection.
Does this sound right?
Does this sound right?