Tesla'sprotege
Member
- Location
- Homestead,Florida
- Occupation
- Electrician
Customer has a 400 amp split style service (two 200 amp disconnects) He is installing a 70 kw diesel generator, he wants a ATS, but hes also requesting a remote start /stop inside his house or mansion i should say, ive been researching for hours and to start and stop a diesel generator you need a cool down period . What is really is throwing a monkey wrench in it is he has a photovoltaic system tied in also. Not sure how to do that without this guy actually having topull some levers.The generator is a MQ-Whisperwatt
DCA-70ssiu, how do i install a 200 amp ATS on a split style service that also includes photovoltaics? Trying to post a picture of service