innersurffer
Member
I have a situation in that a 1600 amp MDP was originally bonded with a bonding jumper in the first section ( where the bonding jumper from the factory was installed ) to comply with the bonding the neutral and the ground as the first means of disconnect. A new ATS has been put in front (as far as feeding) this MDP and is now the first means of disconnect and as such, has the bonding jumper in it and we removed the bonding jumper from the MDP. Unfortunatly, the other sections of the MDP were not properly installed (as far as seperating the neutrals and grounds to their respective bars) and are not properly serperated. I believe, either in the original MDP installation or in the addition of panels over the years, the grounds and neutrals were not properly landed to their respective bars and have now become a code issue with this new ATS installation. Can someone give me a code reference that the grounds and neutrals should have been seperated in the original installation?