what are six reasons we ground and bond?
what is one thing we should always do the same, whether we have a grounded or an ungrounded system?
why do we ground the outdoor utility transformer to a ground electrode and then ground the main service again inside the building to a seperate ground electrode?
on a transformer that is considered a seperately derived system and is located inside the building, do i ground both the transformer to a ground electrode and its disconnect panel to a ground electrode just as we do on the main service transformer and main service panel? why or why not?
what is one thing we should always do the same, whether we have a grounded or an ungrounded system?
why do we ground the outdoor utility transformer to a ground electrode and then ground the main service again inside the building to a seperate ground electrode?
on a transformer that is considered a seperately derived system and is located inside the building, do i ground both the transformer to a ground electrode and its disconnect panel to a ground electrode just as we do on the main service transformer and main service panel? why or why not?