I have a situation where there are two utility transformers with solidly grounded wye configured secondaries. We therefore have a 3 phase, 4 conductor service into the plant from each transformer. The service from each transformer is terminated in a transfer switch.
The question is this... Does this transfer switch need to be a 4-pole transfer switch with a switched neutral or is a 3-pole transfer switch with the neutral conductors from each service bonded together allowed? It seems like NEC section 250 covers this issue, but is open to interpretation.