smoke stack lightning
Member
Apon running out of space on the factory installed ground bars on a residental 1 ph. 240v 200A pannel, I was asked to tap screw-in a new ground bar and put new neutral conductors on the new gn. bar. I thought a field installed gn. bar could only be used for eqg conductors, whos right?