EATDIRT
Member
- Location
- SE Wisconsin
I have an opportunity to install a new 1200 amp 120/208 volt three phase service in a machine shop. I have never done this big of a service on my own. The big questions are does the switch gear need to be on a pad? It will be located in a shipping and receiving area. Subject to fork truck traffic. Does it need to be guarded? What are the requirements for grounding and bonding of the service? Do I need to run a ground wire to building steel, metal water pipe, and ground rods? The grounding electrode conductor should be 3/0? What size wire do I need to run to the ground rods #4? The biggest service I've done on my own was 600amps 120/208 volt three phase.
I really appreciate your help.
Thanks
I really appreciate your help.
Thanks