rojay
Senior Member
- Location
- Chicago,IL USA
Our company is being asked to "mirror" an installation that was done by another contractor. It is for a single phase 200amp 120/208 volt service. The feed for the service is coming from some switchgear located in the basement of a 5 story building(three phase 4 wire 120/208). The previous contractor has installed a three phase meter and a fed it three phase to the line side and went single phase out of the meter through the disconnect and to the load. Does anyone have any thoughts as to why I would want to mirror this kind of setup vs. using a single phase meter and disconnect?