Cjmcelectric
Member
- Location
- Crystal Lake Illinois
Hello all ,
I was wondering if some can explain 2011 code change for sizing a GEC in separately derived service . I'm mainly talking about the secondary side of transformer grounding to first means of disconnect ?
Thanks
I was wondering if some can explain 2011 code change for sizing a GEC in separately derived service . I'm mainly talking about the secondary side of transformer grounding to first means of disconnect ?
Thanks