phoenixthewolf
Member
We are installing 200amp service to this commercial building with a 100apm sub panel in the office. the buildings are connected and there is space to run the feeds for both services inside the wall. My question is dose code allow you to run the feeds on the inside of the wall for the 100 amp service or dose it have to be trayed out side over to the service I have checked the code book and found zipo on the subject