Trying to figure out if this is kosher or not. I am picking up where another electrician left off. Homeowner paused the build for a while and the previous electrician moved on. Rough in is mostly done, but trying to wrap it up to get it inspected, so trying to reverse engineer everything. There is an ”Ufer” turned up out of the slab, with a ground wire running back to the first disconnect, but there is also 2 ground rods with a #4 copper that feeds up to the meter base. Anyone else doing it like this? AHJ confirmed that it is correct.