That Man
Senior Member
- Location
- California, United States
- Occupation
- Electrical Designer
Is there guidance in the NEC, or IEEE color books, or some other U.S. code that addresses this scenario? Client is installing a new industrial facility system. They have detailed historical data from the same design installed elsewhere, and would like to size the new service based on that historical data instead of using connected load numbers. I thought there was an exception or FPN in the NEC that addresses this, but I'm not seeing it.