liaxx2023

Member
Location
utah
Occupation
Solar Sales Representative
What do we need to check or know before adding a new service to a property?

Let's say we are adding a new service dedicated only for new specific loads.
  1. Does this mean we will be adding a new meter dedicated for a specific loads only?
  2. If so, how we will connect it to the existing utility transformer if there's already an existing service?
  3. How do we compute or check if the service that we will be adding would not overload the existing utility transformer?
  4. What's the difference on the normal configuration if we'll be doing a bus tap on the existing utility transformer?
 