chiefkona1145
Member
Good morning,
Is the design professional required, by code, to perform arc flash calculations and turn the resulting labels over to the installing contractor for label installation on the installed equipment? Or, is the calculation the responsibility of the installing contractor, or a third party organization hired by the contractor?
Please excuse me if this subject has been covered previously and if it has, please direct me to where it was.
Thank you and have a good day
Is the design professional required, by code, to perform arc flash calculations and turn the resulting labels over to the installing contractor for label installation on the installed equipment? Or, is the calculation the responsibility of the installing contractor, or a third party organization hired by the contractor?