elohr46
Senior Member
- Location
- square one
Does anyone know if NM was permittted as a HCF wiring method in 1999? The building is classified as a type IV construction and the light fixtures are wired in romex. The ceilings are about 10' high. Also, what code cycle was HCF MC cable required?