I have a 7 story apartment building that customer wants me to rewire. The Building is a poured concrete ceiling, metal studs and wire lathe with no lumber at all.
I would love to use nm-b/romex but it looks to me like it is not allowed based on 334.12 A. Am I seeing this correctly?
I am thinking all this will have to be installed with MC.
Bob/I wire-this building is in Cambridge so maybe you have some experience with the City?
I would love to use nm-b/romex but it looks to me like it is not allowed based on 334.12 A. Am I seeing this correctly?
I am thinking all this will have to be installed with MC.
Bob/I wire-this building is in Cambridge so maybe you have some experience with the City?