A foreman was asked today about why he used these plastic hooks to support runs of temp wiring on the jobsite. These things are what normally would be used to lace control wires in say a big starter...they look like the letter b...
Normally we use ceramic "victor splits" for this support but the foreman said they cost too much (at $1.60 a pair!) and that's why he's using these.
I'm curious as to what others are using outside of NY for the support of temp lighting and power on jobsites...
Normally we use ceramic "victor splits" for this support but the foreman said they cost too much (at $1.60 a pair!) and that's why he's using these.
I'm curious as to what others are using outside of NY for the support of temp lighting and power on jobsites...