I am doing work in a 6 story codo building.
The construction is trusses and steel beams with
5/8 sheetrock on the ceilings and 1/2 plywood for the balcony ceilings. My qustion is nm cable allowed in all these areas above the ceilings?
I would think that there is the possability of the nm sheath getting damaged as it is pulled thru
under or over the trusses. Also I do not think that the 1/2 plywood is fire rated. Am I correct or mising something?
The construction is trusses and steel beams with
5/8 sheetrock on the ceilings and 1/2 plywood for the balcony ceilings. My qustion is nm cable allowed in all these areas above the ceilings?
I would think that there is the possability of the nm sheath getting damaged as it is pulled thru
under or over the trusses. Also I do not think that the 1/2 plywood is fire rated. Am I correct or mising something?