tedge
Senior Member
- Location
- Camden, ME
I got a bid package today for a total remodel of a 5-story, multi-use brick building. It specifies NM cable as the wiring method. Now, I remember at some point there being specific wording in the NEC about no NM in 3 or 4 story (or higher) buildings, but it is not in Art. 334 of 2005 or 2008. What is there, is a bunch of gobbledee-gook about construction type, etc. Someone tell me that I'm not crazy, and that the owner of this building is about to find out that it's going to cost him a whole lot more for his electrical than he thought.