ptonsparky
Tom
- Occupation
- EC - retired
Read an article about a large school building in Mass that installed a state of the art lighting control system when it was built. Something broke and the lights have been on with no easy way to shut them off for the last 1.5 years.
Low bid or was that common enough?
Replacement system will have local override included.
Low bid or was that common enough?
Replacement system will have local override included.