morgan3520
Member
- Location
- Dallas, TX
- Occupation
- Electrical Engineer
I'm on a project adding loads to an existing system. A water treatment facility built in 1990. Problem they do not have the electrical drawings. A field walk down of the site, I could not find any evidence of grounding. Not on the pipe rack or the motors. Can a grounding system be put in for the new loads and pipe rack and connect the existing pipe rack and equipment?