The company I work for is adding a 3 phase panel in order to power a piece of equipment. There is already an existing single phase panel. The new panel will not be in the same room as the existing. I checked with the county code informent group an they said it would be fine as long as the mains were labeled.
I'm assuming this means that at each panel I need to place a label saying there is another panel. Does anyone know what the verbage would be on such a label?
tia