My resedential blg inspector (former Electrican),
rejected the 12 housings installed and wired in on a new room addition were constructing. Past projects Inspectors have signed off w/the 1/2" combustable and 3" insulation clearances.
Obtained a letter from the manufactures Project Due to his insistance I told him I would enclose them in a drywall cavity. Allowing 3" clear on sides and top of Housings. He declinded the installation. I obtained a letter from the manufatures Saftey Engineer and forward it to him. Should this be sufficient?
Thanks
rejected the 12 housings installed and wired in on a new room addition were constructing. Past projects Inspectors have signed off w/the 1/2" combustable and 3" insulation clearances.
Obtained a letter from the manufactures Project Due to his insistance I told him I would enclose them in a drywall cavity. Allowing 3" clear on sides and top of Housings. He declinded the installation. I obtained a letter from the manufatures Saftey Engineer and forward it to him. Should this be sufficient?
Thanks