I will be installing floor boxes in a Chiropractic office. According to 517.13 wiring method has to be in metal raceway or sheath.
I was planning on using PVC schedule 40 to a non metallic floor box in the concrete slab.
Would this be in violation of 517.13?
If so would it be acceptable to pull HCF mc in the PVC but I don't know how I would terminate the jacket for redundant ground
I was planning on using PVC schedule 40 to a non metallic floor box in the concrete slab.
Would this be in violation of 517.13?
If so would it be acceptable to pull HCF mc in the PVC but I don't know how I would terminate the jacket for redundant ground