Hello. I have tried looking up this topic quite a few times and see different responses or requirements;
What I have is a proportional solenoid driver module, designed for mounting on a din rail, that will control a solenoid in a class 1 div 1 area. The solenoids are marked UL for class 1 div 1. The driver module made by the same company is not rated and is only marked CE which of course means nothing for us. What I am looking at doing is placing the driver module in a class 1 div 2 area and running the signal with approved cabling and glands to the solenoids.
Now since this isn't rated for installation in div 2, I am unable to put it in our PLC panel that is div 2. We have been told we could possibly put it in a seperate explosionproof enclosure and use it. We may have to possibly get the whole assembly tested and certified to do this.
What I am trying to find out is what is involved, and if there is really a need to have the assembly tested if we are going to use it in an EX enclosure with all fittings and cables approved for enclosure. We have no issue in purchasing the more expensive enclosures and parts, it is mainly a time factor in getting this equipment ready.
What I have is a proportional solenoid driver module, designed for mounting on a din rail, that will control a solenoid in a class 1 div 1 area. The solenoids are marked UL for class 1 div 1. The driver module made by the same company is not rated and is only marked CE which of course means nothing for us. What I am looking at doing is placing the driver module in a class 1 div 2 area and running the signal with approved cabling and glands to the solenoids.
Now since this isn't rated for installation in div 2, I am unable to put it in our PLC panel that is div 2. We have been told we could possibly put it in a seperate explosionproof enclosure and use it. We may have to possibly get the whole assembly tested and certified to do this.
What I am trying to find out is what is involved, and if there is really a need to have the assembly tested if we are going to use it in an EX enclosure with all fittings and cables approved for enclosure. We have no issue in purchasing the more expensive enclosures and parts, it is mainly a time factor in getting this equipment ready.