bjp_ne_elec
Senior Member
- Location
- Southern NH
I have a job that is going to require Wiremold, and I was wondering if there are any issues notching the ceiling grid where the Wiremold needs to penetrate in to the area above the ceiling. Hate to offset the Wiremold, as I just think it would be much cleaner to keep it huggin the wall - not that I haven't offset Wiremold before - but I'm not crazy about doing it. Is this a question to the building owner - as the custmore (lessee) does not have an issue with it. Or is this a question for the building inspector? I don't see this as impacting the integrity of the ceiling grid.
Thanks,
Brett
Thanks,
Brett