hambone1216
Member
- Location
- Rochester new york
I'm trying to find out what the requirements are in order to be "listed" as a certified installer(wind turbine/generator) by the NYSERTA program. The extent of info so far was that three seperate classes were needed. I'm not sure if certification is required for stand alone systems, or for systems that are intended to contribute to the grid through transfer switch. Any clarification, knowledge, or a general finger point towards a resource would be helpful.