Sorry, but this is a continuation from another thread. I was very rushed and posted the wrong info. Trying to size feeders and OCPD to a 3 phase sub panel to power these 2 machines. Here is correct info below
Machine 1 10,400VA (Actual Draw peak is 46amps/39amps)
Machine 2 10,400VA (Actual Draw same as above) Both 208V Single Phase
Phase A 10,400VA
Phase B 5,200VA
Phase C 5,200VA
Looking for below
Min Size Feeder
Min Size OCPD
Machine 1 10,400VA (Actual Draw peak is 46amps/39amps)
Machine 2 10,400VA (Actual Draw same as above) Both 208V Single Phase
Phase A 10,400VA
Phase B 5,200VA
Phase C 5,200VA
Looking for below
Min Size Feeder
Min Size OCPD