I'm looking in 551, but not seeing how to size the OCPD for each site.
The reason I'm asking is that today I was troubleshooting a power issue at a site that was a 30/20.
I wasn't able to find the breaker for the site (nothing was labeled) so I used my circuit tracer and it led me to a 2-pole 60 .
turns out the adjacent site was the other half of the breaker.
I was expecting to find a 1-pole 30 but there were none.
Then I thought maybe there'd be a 2-pole 30 and maybe the 2 sites would be sharing the neutral.
I was surprised to see a 2-60. Would this be normal?
What would determine how to size the OCPD for sites?
The reason I'm asking is that today I was troubleshooting a power issue at a site that was a 30/20.
I wasn't able to find the breaker for the site (nothing was labeled) so I used my circuit tracer and it led me to a 2-pole 60 .
turns out the adjacent site was the other half of the breaker.
I was expecting to find a 1-pole 30 but there were none.
Then I thought maybe there'd be a 2-pole 30 and maybe the 2 sites would be sharing the neutral.
I was surprised to see a 2-60. Would this be normal?
What would determine how to size the OCPD for sites?