Check Pilot
Member
I'm wondering about the requirements for grounding solar powered systems for 120/240 that are independent of so called "on grid" systems. Most of the distributors here in Canada, at least, seem to think grounding is a bit unnecessary, which seems to be way outside a normal system.
Does anyone have any advice?
Does anyone have any advice?